Queries, comments, suggestions? Please contact us.



Area Generation, transmission and distribution of electrical energy – Dependability and quality of service of electric power systems / Outages of electric power systems equipment

IEV ref 692-04-05

en
forced outage
unplanned outage that cannot be deferred

Figure 4 – Outage relationships

Note 1 to entry: A forced outage can be initiated by automatic or manual means. In the former case, it is referred to as forced automatic and in the latter case as forced manual.


[SOURCE: IEC 60050-603:1986, 603-05-08, modified – Definition revised to refer to the concept unplanned outage defined in 692-04-04]


fr
indisponibilité non différable, f
indisponibilité forcée, f
indisponibilité fortuite qui ne peut être différée

Figure 4 – Relations entre indisponibilités

Note 1 à l’article: Une indisponibilité non différable peut être déclenchée par des moyens automatiques ou manuels. Dans le premier cas, elle est désignée comme une indisponibilité automatique non différable et dans le second cas, comme une indisponibilité manuelle non différable.


[SOURCE: IEC 60050-603:1986, 603-05-08, modifié – La définition a été révisée afin de faire référence au concept indisponibilité fortuite défini en 692-04-04]


ar
خروج اضطراري
خروج إجبارى

de
erzwungene Nichtverfügbarkeit, f

es
indisponibilidad forzada

ko
사고 정지

ja
強制停電

mn
зайлшгүй тасралт

pl
wyłączenie nagłe, n

pt
indisponibilidade forçada

zh
强迫停运

Publication date: 2017-12-15
Copyright © IEC 2024. All Rights Reserved.